Margaret Street Stormwater Pump Station Upgrade, Tatura

Margaret Street Pump Station

The major upgrade of the Margaret Street Stormwater Pump Station in Tatura has now been completed, delivering a significant boost to the town’s stormwater management and overall resilience during heavy rain.

Thank you!

Council thanks local residents for their patience throughout the design and construction period. Your support helped bring this important upgrade to completion.

This upgrade was first identified in Council’s 2020 Drainage Strategy, which set out to address stormwater issues across the region and ensure our infrastructure performed well during major storm events. The Margaret Street station plays a vital role in Tatura’s drainage network, managing around 90 per cent of the township’s stormwater. Its renewal has been an important investment in protecting homes, businesses and community facilities well into the future.

What was delivered

Stage 1 of the project was awarded to Aquatec Fluid Systems Pty Ltd in December 2024. All works have now been finalised. The upgrade included:

  • Installation of two new pumps:
    • Pump 1 750 litres per second
    • Pump 2 can move up to 1,950 litres per second
  • A brand-new Powercor electrical kiosk Increased security of the power supply and provides a generator connection point to keep the station operating during extended outages.
  • A new switchboard buildingWith its own generator connection panel, ensuring Council can supply backup power if required.
  • Use of the existing high-quality concrete structureHousing modern equipment and support future growth.
  • Measures to reduce odours Prevents stagnant water in the wells, including:
    • A new opening between the high-flow and low-flow wells to assist drainage
    • A small maintenance pump that runs if the main low-flow pump hasn’t operated for a set time
  • Upgraded softwareAllowing Council to:
    • Monitor well levels in real time
    • Receive alerts if faults occur, including power outages
    • Start pumps remotely
  • Improved onsite safety features Includes mounted flood lights for night works, reinforced grating over well openings, and a new ladder.

Benefits for the community

This project has delivered a modern, reliable and safer stormwater pumping system for Tatura. The upgraded station now handles existing flows more effectively and is ready to support future demand as the town grows. The enhanced power reliability, improved technology and added safety features all contribute to a more secure and efficient system that will serve the community for many years.

For further information

For any questions about the completed works, please contact Council’s Project Manager on 5832 9700 or email projects@shepparton.vic.gov.au.