Please note: this is an archived news article release
This article was published on Tuesday, 22 April, 2014. The information contained within may be out of date or inaccurate. News articles and media releases older than 60 days are archived for future reference.
Posted on Tuesday 22nd of April, 2014,
Greater Shepparton City Council has received the first of two commissioned traffic studies on vehicle movements on Andrew Fairley Avenue.
The Draft Stage 1 Traffic Study Report has been prepared by Traffic Works Pty Ltd, a Melbourne based specialist traffic engineering firm who have done a variety of similar studies for Greater Shepparton City Council, VicRoads and other Councils in the past.
The draft report was received on Thursday 17 April just prior to the Easter break. Council staff reviewed the report over the Easter break and it has been released to the public at the earliest opportunity on Tuesday 22 April 2014.
The report is only a Stage 1 report and as such, reflects basic traffic count and modelling data for traffic flows in and around the area impacted by the proposed closure of Andrew Fairley Avenue. In some cases the report is based on modelled data rather than actual observations. Council has instructed Traffic Works to complete some additional counts to verify their modelled data. It does not examine traffic management measures arising from the Stage 1 report - these will be dealt with in the Stage 2 report.
The Stage 1 report does not include an analysis of pedestrian and cyclist movements. These are being conducted today.
The roundabout at the intersection of Hawdon Street / Balaclava Road / Verney Road and New Dookie Road will be included in the Stage 2 report.
The report indicates that Council roads in the vicinity of Andrew Fairley Avenue now carry traffic volumes ranging from 3,500 to 12,000 vehicles per day. With the proposed closure of Andrew Fairley Avenue, these volumes are predicted to increase to 4,500 - 12,500 per day in the short term, rising to 5,500 - 14,500 per day over 10 years.
The Midland Highway carries approximately 18,000 vehicles per day now and will grow to 22,000 over the next 10 years with the proposed closure.
The centralisation of SPCA's operations to the Shepparton site has resulted in a slight reduction in overall SPCA generated traffic, primarily due to a reduction in inter-factory traffic movements.
Traffic queuing at intersections of local roads has been identified as an issue in the Stage 1 report. Traffic Works have been instructed to complete detailed counts at these intersections this week to verify their modelled data. Intersection redesign, including signalling, may be required to improve traffic flows and will be the subject of recommendations in the Stage 2 report.
Intersections identified that show modelled traffic flows close to theoretical saturation points include:
Lockwood Road has been identified as a road that will potentially need redesign in the next 10 years.
The Stage 2 report is being developed by Traffic Works at present and Council expects it to be available to Council and the public in early May 2014.
The reports can be found at http://www.greatershepparton.com.au/council/communityconsultation/consultation/andrewfairleyave/
More News from Greater Shepparton
Monday 23rd of March,
Asphalt renewal nightworks in Maude and Nixon Streets, Shepparton
Asphalt renewal nightworks are programmed for Maude Street, between Nixon Street and Knight Street, Shepparton and on Nixon Street, between Wyndham Street and Maude Street, Shepparton from today, Monday 23 March to Thursday 2 April 2026, weather permitting. Read more
Monday 23rd of March,
Merrigum and surrounds – Leaping into Safer Communities workshop
Council is inviting residents of Merrigum and surrounding communities to attend a workshop to identify local emergency risks and discuss ways to strengthen community preparedness and recovery. Read more
Friday 20th of March,
Last chance to apply for 2026 Community Leadership Program
Council is reminding community members that applications for the 2026 Community Leadership Program close soon. Read more
Thursday 19th of March,
Safer intersection coming for Kialla West
Council welcomes a jointly funded upgrade to the Goulburn Valley Highway and Cemetery Road intersection in Kialla West, which will deliver improved safety for motorists and families travelling to and from school. Read more
Wednesday 18th of March,
Strong community support for the 32nd Annual Tatura 100 Lap Challenge
The 32nd Annual 100 Lap Challenge was held on Saturday 28 February 2026 at the Tatura Swimming Pool, bringing the community together to raise funds for Tatura Hospital and Parkvilla Aged Care Facility. Read more
Monday 16th of March,
Converge on the Goulburn is almost here with a vibrant 2026 program
Council has officially launched the program for Converge on the Goulburn 2026, inviting the community to discover what is on offer when the much-loved festival returns on Saturday 21 March from 2pm to 9pm at Victoria Park Lake in Shepparton. Read more
See All News
Want to get the latest news and events in your Facebook feed?
Just go to our Facebook page and click the Like button.
More Events in Greater Shepparton
Tuesday 24th of March,
Low Pressure Poetry Workshop
Facilitated by renowned artist Fleassy Malay, Low Pressure Poetry is a hands-on and creative workshop that explores writing poetry through found sources with playful prompts and formulae. Read more
Friday 20th of March, – to Sunday 29th of March,
The Pieces That Made Me
The exhibition titled “The Pieces That Made Me” features six large paper collage/mixed media artworks by Ruby Wyatt-Carter Read more
Wednesday 25th of March,
Shepparton Arts Festival Raffia Weaving Workshop @ Kaiela Arts
Weaving is a knowledge passed down through generations, strengthening identity, kinship and ties to Country. Read more
Tuesday 24th of March,
Netball - Come and Try
Shepparton Netball Association is hosting a Netball Come and Try program designed especially for 7 and 8 year old boys and girls who have not played netball before. Read more
Tuesday 24th of March,
Back to Back Theatre Workshop
The workshop is a combination of movement and talking. It’s about connection and disconnection. It’s about patterns. We play games and set up improvisations. It’s about the things you choose to divulge,… Read more
Friday 20th of March, – to Sunday 29th of March,
Connection to Place
Jacqui Francis in collaboration with Goulburn Valley School Communities. Discover the artistic talents of Goulburn Valley schools at the Connected School Communities Art Exhibit 2026. Read more
See All Events