The work, which will cost approximately $14,000, will mean the bridge will be closed on 17 and 29 November.
Greater Shepparton City Council’s Director Infrastructure Steve Bowmaker said the installation of height restrictors will stop overweight vehicles travelling on the bridge and causing unnecessary damage to the bridge.
“The works need to be carried out a week apart so the concrete can set before the height restrictors can be bolted to them,” Mr Bowmaker said.
“Motorists are asked to adhere to traffic signage on the days the bridge is closed and plan their trip to avoid the area.
“We apologise for the inconvenience, however these works will extend the life of the bridge.”